Portfolio Highlights, continued
Great Lakes Naval Station, Great Lakes, Illinois
Greener Engineering is providing building
commissioning services for the renovations of the
heating, ventilating and air conditioning system for
Building 236 and Building 523. Both projects are
design building delivery and Greener is providing
the coordination of the testing and documentation
of the system to provide for proper turn over to the
Navy.
Greener Engineering is utilizing its "Greener
Virtual Commissioning Plan" for this project
providing all commissioning documentation live to
the project team as it is developed and executed.
Harper College Engineering and Technology Center
The $38 million project will transform two 1960's-era
buildings into a modern high tech facility to
accommodate growing demand for training programs
that lead directly to jobs like welding, manufacturing,
architectural technology, HVAC, maintenance
technology, law enforcement and fire science.
This project is funded in part by a $20 million grant
from the State of Illinois. The project goal is to
achieve a USGBC LEED Silver rating. Greener
Engineering is providing fundamental and enhanced
building commissioning services as well as
measurement and verification. Greener Engineering
is utilizing its "Greener Virtual Commissioning Plan"
for this project providing all commissioning
documentation live to the project team as it is
developed and executed.
Building Commissioning Services
Mother McAuley High School Science Addition
The two-story addition will be located between the
current Language/Theology and Art/Science wings
of the school and will offer a laboratory and
classroom collaborative environment. In addition to
the chemistry labs will be prep rooms, storage, and
a science team office.
Greener Engineering is utilizing its "Greener Virtual
Commissioning Plan" for this project providing all
commissioning documentation live to the project
team as it is developed and executed.